Professional manufacturer of tile grout and adhesives with 27 years experience.

A big problem that plagues owners-how to do bathroom waterproofing

by:Kastar     2021-04-06

The bathroom is a key project of home decoration, and it is also a place where problems are likely to occur during decoration. A little carelessness may cause serious problems such as water leakage and accumulation. The bathroom is powerful, and the amount of water used is relatively large. If your bathroom encounters a dark guard, it will be damp and cold all year round. After many people live for many years, they will find that the wall of the bathroom will have different degrees of wall peeling and water stains on the wall. The reason for this problem is that the waterproofing of the bathroom is not qualified! So what should be paid attention to in the waterproofing of the bathroom? We together look. Prepare the bathroom for waterproofing. Leveling layer The toilet leveling layer should be cleaned up. Dust, debris, etc. should be cleaned. The remaining mortar and hard blocks on the surface should be scraped. Clean the parts that are not easy to clean around the root of the tube. Use a brush to clean the dead corners and stay against the wall. The root of the pipe needs to be sloped to avoid accumulation of water. This can avoid leakage of the waterproof coating due to uneven thickness or piercing the waterproof membrane. The joints should be painted in place. The joints between the wall and the ground and the pipes between the upper and lower water and the ground joints are prone to problems. These corners and corners must be handled properly, and the waterproof coating must be applied in place . Waterproof height of the toilet In the general waterproof treatment of the toilet, a certain height of waterproof coating should also be used on the wall to prevent the accumulation of water from penetrating the wall and returning moisture. However, if the wall of the bathroom is a non-load-bearing light-body wall, the entire wall must be covered with waterproof coating. Keep the drain unobstructed. All drain pipes in the bathroom, including floor drains and sanitary ware drain pipes, must be kept unobstructed to prevent accumulation of water. Pay attention to the waterproof construction of the bathroom. Under normal circumstances, after the partition wall is completed, the shower room needs to be structurally closed for acceptance. After the acceptance is passed, the structural surface will be waterproofed once; the second waterproofing needs to be carried out after the ground leveling layer is completed. The height of the two waterproofing needs to be mm; the materials used for indoor waterproofing are flexible waterproof coatings such as polyurethane and acrylic. , In order to ensure the waterproof effect and prevent the moisture in the cement mortar leveling layer from penetrating into the dry area of u200bu200bthe toilet, in addition to the necessary waterproof coating, it is recommended to compare the cement at the junction of the toilet and the aisle, and the dry area and the wet area of u200bu200bthe toilet. C concrete back sill with higher mortar density. , Only in the space with shower, the height of the waterproof layer needs to be mm. For other toilet spaces without shower equipment, the waterproof only needs to be mm. There are a lot of waterproof coatings on the market for self-repairing waterproof coatings in Meijiao factory. Many owners are dazzled and don’t know which one to choose. Here, the editor recommends a series of self-repairing waterproof coatings from Meijiao factory, waterproof good results. Meijiaji factory self-repairing waterproof coating is a two-component water-based waterproof slurry, which is suitable for waterproofing absorbent surfaces such as bathroom floors and walls, kitchens, and balconies. It has good water resistance, alkali resistance, and bonding strength. Advanced features. Scope of application: solid substrates composed of concrete, brick masonry, precast, lightweight bricks, etc., walls and floors of indoor and outdoor buildings, such as tunnels, bridges, basements, kitchens, balconies, toilets, swimming pools, Water reservoirs, etc., are also applicable to the waterproofing of kitchens, bathrooms, and balconies. Instructions for use: Basic level inspection: Before construction, ensure that the basic level is strong, free of oil and other loose objects. .Wetting the base layer: Wet the base layer with clear water to saturation, and only when there is no clear water in the base layer, can the construction be carried out. .Pour the liquid material into a clean plastic bucket; then slowly add the powder material while stirring according to the proportion, and stir it fully until a uniform glue slurry without powder clusters is formed. .Leave the slurry to mature for about minutes, and then stir for about seconds. .Use rollers or brushes for construction. It is recommended to apply-once, and the thickness of the coating should not exceed mm. The total thickness of the waterproof layer needs to be above .mm, and the thickness of the coating per square meter should be mm thick until the coating film is completely dry. Road process. .. After the coating film is completely dry (after hours), the closed water test can be carried out. Note. For the construction of the pipeline, gauze can be used to strengthen the treatment. For the long-term storage pool, you should wait two weeks before making mortar or tiling. The residue on the tile surface needs to be cleaned up within hours after the United States is sewn. .Do not mix with water or any other materials, and do not change the liquid and powder at will. In the later construction of tile paste, etc., the waterproof layer must be protected. If it is accidentally damaged, it must be repaired immediately to check the waterproof effect. The self-repairing waterproof coatings made by the beauty seam agent factory will add warmth and comfort to your home.
Waterproof toilet big problem
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...