Archaize brick is in recent years, the ceramic tile industry is new bestow favor on, its pattern diversity can match many different decorate a style, matte glaze and can let a person away from indoor light pollution, the style that restore ancient ways also give a person a kind of low noble feeling, so many of the owners can choose to use archaize brick to as floor tile and wall brick. For the owner, the archaize brick conforms to their aesthetic, can reflect their home outfit grade. Good for sewing teacher, archaize brick, but its surface is uneven, carelessly during the construction of the tiles scratched easily. Beautiful seam an agent factory beautiful seam from the perspective of archaize brick, from its features, advantages and disadvantages, etc, make archaize brick and beautiful seam with better.
1, the crack-cleaning and waxing
before construction, the need for ceramic tile aperture to clean up. Take a gap with a few strokes knife ceramic tile aperture, if out of the dust is powder, then you can start the seam; If still with mud, so ceramic tile aperture is not completely dry, need another few days to do the seam.
due to the large brick joints of archaize brick generally, some owners may advance to do part of caulking, crack-cleaning will need to use pen knife scrape on the surface of about 1 mm thickness. With hair brush the crack-cleaning walked down to the dust, if you have a vacuum cleaner can clean up again after cleaned up. Didn't do it of ceramic tile aperture, dive knife clear ceramic tile aperture, cleaned up after using high power vacuum cleaner to absorb dust, archaize brick wear-resisting degree is not high, and sometimes of ceramic tile surface uneven, so at the end of the qing seam evenly on both sides of ceramic tile waxing, facilitate the remaining material to clean up late.
2, install glue guns
to the top of the feeding mouth along the Angle of 45 degrees oblique cut out a small mouth, diameter is slightly less than the diameter of the ceramic tile aperture. To open the material mouth is installed in the beauty of the sew, load the glue gun. Before the start of construction, and need to sew the products about 30 ml need not, because the seam product is AB in charge, may appear uneven mixing condition.
3, start the sewing seam
unscrew the cap and pull the plug, and then screw in mixing tube, with box cutters mixing mouth cut into 45 degree Angle, slightly smaller than ceramic tile aperture. Due to the sizes and brick joints when handling mixture mouth width depending on the specific situation. When the construction joints, metope from high to low, the ground from the inside to the outside. Beauty don't somehow cross stitch seam construction process, first make vertical or horizontal line, first in the same direction later for another direction of construction. Construction process to speed trim, and uniform discharge.
as pause placed over 2 minutes, in the process of construction should be out anew again 30 ml, suggest a one-time play a material. Seam pressure when not too big, hard material planish, should be slightly lower than ceramic tile surface, seam pressure, encounter the cross outlet cross interface centered on both sides to flatten.
4, late cleaning
after completion of the seam, it can complete dry let stand for 24 hours. On both sides because of archaize brick has been marked by wax before construction, so just use the shovel will edge remaining material scooping up gently, and then can be torn off by hand.
the archaize brick seam construction steps and eight points for attention in
1, guarantee the construction base must be smooth, solid, no dust.
2, ceramic tile seam width is best.
3, discharging mouth mouth, discharging to uniform.
4, each finished, jointing again when discharging mouth since a small amount of material overflow available paper erasure.
5, in the cross interface more small brick construction should be as little as possible when discharging, the material out, filled out the horizontal seam in the process of scraping in cross joints shall blow gently to prevent material.
6, after construction, must wait until the surface is slightly dry again after the seam an agent to remove spilled material.
7, if it is sponge brush type method, to wipe down the gap on either side of the, if at the beginning of the remaining material is too much, can use first part scraping an eraser to reoccupy sponge.
8, 12 hours after the ground construction, before the material did not work, don't walk on it, so as not to get dirty on the ground, pollution of the surface of seam an agent.
recommended articles:
ceramic tile seam (home and don't do Penitence dead you)
don't do the ceramic tile seam at home?
how beautiful, how to identify the seam quality
beauty sitting room ceramic tile seam a harm, what are the taboos
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378