1. According to about 37% of the proportion of water to add water into the mixing barrel, add powder, with electric mixer mixing into a smooth, no powder paste. Let stand for a few minutes after stirring again, can be used.
2. Use putty spatula mucilage evenly daub the base surface, daub 2 - commonly 3 times. The second daub should be carried out in the first coating is dry.
3. Final daub after complete, depending on the weather. Available in 1 - 2 times after grinding. When polishing will mark smooth gently. Don't overly polished lest affect intensity.
4. About 5 - After 7 days to finish the construction, such as the need to advance the construction, should be treated with alkali resistant primer first.