step 2: use a pressure as the pressure side, the glue material before dry tear the paper, then the beauty of meimei seam an agent construction completed
the seam construction matters needing attention
1. The cleaning carefully before construction brick surface cracks in besmirch, confirm the gap can not have water and dust
2. The construction of the best temperature 5 to 35 ℃, this product should not be used in direct sunlight place
3. Inside the hose is not after use glue, unscrewed the mixing tube first, wipe out the hose head spilled glue, then use glue to tighten the preserve
4. The construction process, such as operation 20 minutes continuous glue, colloid has gradually solidified in the mixing tube, such as not easy to play, need to change the new mixing tube
recommended articles:
the seam an agent to reconcile construction procedure diagram
the seam floor tile construction steps method
when to use the construction good seam an agent
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378