One, the basic requirements and processing: basic level surface should be smooth, rough, clean, no oil, no float ash, dusting, empty drum, there should be no cracks. Construction before application of high-pressure spray on them and keep wet state, but can not have water. When binding, can besmear brushs interface treatment agent in advance. Materials: 13% according to water than the water mix, with good size should guarantee at 0. 5 - Finished in 1 hour. 3, construction: 1, in the wet concrete base surface evenly over the first polymer epoxy coating at the end of the grout ( Powder: water by weight ratio of 3:1) , coating and polymer epoxy grout. High polymer epoxy grout shoulds not be too great a construction area, the article should be partitioned staggered construction, each area should not be greater than 10 m2, the interval of staggered construction should not be less than 24 hours. Layered construction, seam location should be staggered to each other. 2, high polymer epoxy grout paving should immediately after hydraulic pressure and a smooth, should not be repeatedly put pressure. In case of bubbles should be punctured, the surface should be compacted. Facade or on the surface of the roof should be layered construction layer thickness is greater than 10 mm. The appropriate thickness of each layer of plaster for 5 - Before 10 mm, with a layer of touch when may lower the construction be carried out. Four and maintenance: high polymer epoxy grout after construction, surface touch after drying should be spray curing careless or override, keep wet sacks, etc. The curing temperature is not below 5 ℃. High polymer epoxy grout construction after 24 hours, covering plastic and wet curing 7 days, conditional can be timing sprinkling water on the surface.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378