1, the coat has been absorbed by grassroots, table dry state ( 2 - after besmear bottom construction 6 hours) And start self-leveling construction. 2, add 6 - in the container 6. 5 litres of water ( Pay attention to the intensity) Or 6. 5 - 7 liters of water ( Pay attention to the spreading rate) , then slowly add a pack of 25 kg of caulking agent manufacturers, self-leveling cement mixer to stir evenly without group's slurry, let its maturation, about 2 minutes and short mixing time, the slurry mixture poured out, evenly spread out, with dedicated tooth mouth scraping board group to control the thickness. Just pasted the mixture to prevent direct sunlight and strong winds. Insufficient ventilation or low temperature has obvious influence on the drying time extended. 3, before the self-leveling initial setting, with foam roller rolling ground to eliminate mixed into the air. 4, laying construction interval between 10 - Within 15 minutes as well, so that connect line is flat and level. 5, such as construction needs to be laid in multi-layer self-leveling, between each layer need to coat with extension of multi-function interface agent ( A layer of dry after 24 hours) To ensure the construction quality. 6, in the absorbent at the grass-roots level, such as ceramic tile laying self-leveling, should be laid at least 2 mm.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378