Item description: cement base permeable crystallization type waterproof coating. Nickname: cement-based permeable crystallization, infiltration crystalline waterproof coating, cement based waterproof coating. Price: 12. 5元( Per kg) 。 Minimum quantity: 20 kg. Material: transparent color liquid. Specifications: WCXY. Brand: WCXY units: kg, 20 kg/barrel. Function: waterproof repair. Origin: Beijing. Sales area: the country. Features: high permeability strong alkali resistance, colorless, tasteless environmental protection long-term hydrophobic harmless, easy construction. Construction process: cleaning the dust - Remove the wall cement agglomerate - Remove the cement agglomerate - tube at the base Remove empty drum - tube at the base Remove the cement agglomerate - waterway renovation legacy Clean the pipe root. Function: used for external wall be affected with damp be affected with damp, bathroom metope be affected with damp be affected with damp, windowsill leakage caused by indoor humidity, make the bedroom metope damp cause indoor water. Usage: 1 kg besmear brushs area 4 m2 execution standard: the GB18445 - 2012 'cement-based permeable crystallization type waterproof coating is introduced: cement-based permeable crystallization type waterproof material in Portland cement, quartz sand, such as inorganic material as base material, permeable active compounds and other accessories made of a light grey powdery waterproof coating. It is a kind of green, non-toxic, tasteless, pollution-free products, is a kind of rigid waterproof material. This product is in accordance with the water cement ratio, Weight ratio) 0. 25 ~ 0. 31 compound into a paste, general dosage: 1. 2 / ( The thickness of 0. 8) Specific parts, or according to the design requirements of 1. 5 ~ 1. 8 /. The paint should be fully mixing, should not have gray ball. Mix the paint should be finished in 30 minutes. Under the condition of high temperature and time should be shortened accordingly. This product is commonly used construction method has brush, roller brush, scraper scrape, mud and spraying, etc. Or powder coating. Brush roller coating construction should be done twice, brush two intervals of time is 2 ~ 3 h, the positive and negative two directions brush back and forth, other construction method can complete at a time. To repair the holes, cracks, concrete structure surface cellular wait for a phenomenon. In particular, should be cut slurry droplets, the construction of the base surface should be removed before all sorts of sundry, such as mud and debris and oil. Coating construction, must fully keep base moist before painting, sometimes when coating spraying to keep the base moist. This product has a unique moisturizing effect, the construction of the general requirements within 6 ~ 8 hours after spraying, maintenance of 2 ~ 3 times a day, then maintenance (every other day Water cannot be used to maintain and protect wet) 。 High-definition pictures:
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378