To introduce below the ceramic tile seam an agent construction steps: 1, brick joints treatment if the clearance between the brick and tile wide and deep, often first to fill in some caulking material, wait for dry after appearing to take the next step of seam an agent construction, but the need to safeguard seam not less than 3 mm deep. 2, cleaning process if no other materials in advance to fill part of seam, the seam in the United States before the first brick joints for cleaning, inhale dust with cleaner clean, clean with a towel on both sides. 3, stick the crepe paper also clear what kind of your brick, and if the archaize brick or imitation of natural rock, so should be on both sides of the seam as neat crepe paper, but to safeguard, cracks on the surface of the ceramic tile is clean, dry, in addition, the width should be no less than 2 cm crepe paper, viscous force. In order to ensure the effect of cross intersections, somehow the line construction Suggestions separated for 24 hours a day. 4, grab a seam chosen after the corresponding color put glue to the dedicated feed tube, and then put on special glue guns, squeeze, first will be 30 g glue to squeeze in addition to the front end, so that we can make glue mix evenly. Should as far as possible when caulking and ceramic tile surface vertical, while walking speed wants even, grasp the strength and frequency at the same time, so that the glue flow, optimum temperature for 5 - general construction 38 degrees. Seam 5, pressure iron if want to make it a beautiful arc surface after solidification, so we can use the seam pressure ball back and forth along the seam on both sides, maintain uniform force; If you want to make it with ceramic tile face after solidification in a horizontal plane, so you can use the seam scraper or soft rubber sheet from brick force along the seam at one end to the other end, maintain strength, and do not deviate from the crepe paper to prevent pollution of ceramic tile surface. 6, cleaning if posted in front of the crepe paper, then to 5 - after completion 10 minutes and then remove the, and then clean the edge excess glue; If there is no use of crepe paper, so want to in the construction of the three hours after, with clean shovel half solidification of true porcelain glue of ceramic tile surface clean. 7 keep room temperature about 25 °, finished product protection, maintenance for one week, to prevent pollution in the process, the rain, water, walking, etc.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378