High-strength non-shrink grout high-strength non-shrink grout material factory high-strength non-shrink grout material price is the first step: root processing & # 8195; 1 appearance should be cut hair, foundation treatment, seam an agent (or using special reinforcement interface The phone - 158 - 3830 - 4411). Concrete is poured again beautiful seam an agent do interface processing. 2, demand for clean toes in appearance, can not have gravel, laitance beautiful seam an agent, floating dust, grease and stripping sundry. 3, 24 h before grouting, root appearance should be abundant moisture, 1 h before grouting, the eradication of water. Step 2: shuttering the & # 8195; 1, according to the grouting construction drawing for the template. Template and roots, templates and template seams between water mud, adhesive tape, such as seaming, arrive all the template does not leak. 2, templates, and equipment around the base of horizontal interval should be controlled in 100 mm or so, to facilitate grouting construction. 3, grouting in the pulp, such as rendering should be processed in a timely manner. Step 3: grouting material manufacturing & # 8195; 1, when we each time mixing quantity should depends on how much usage, to ensure that within 40 min will run out. 2, if use at the scene when the ban on grouting material adding any beautiful seam an agent, the additive is applied. Step 4: to maintain the & # 8195; 1, when infuse pulp slurry inspection standard of 30 seconds after the careless should be immediately sealed wet quilt or rock, and moist. Fire-resistant grouting material & # 8195; 2, when we are in winter construction, should also conform to the measures for the maintenance of the reinforced concrete engineering construction and inspection standard & gt; ; > ; The relevant provisions. 3, when the moment after grouting expect to open membrane, can to equipment, detailed moment see 'membrane and maintain time and environmental temperature of contact list'. 4, at the end of the grouting equipment foundation, but if you have to get rid of some, can in 3 - after grouting After 6 h, namely to grouting layer with a spatula or shovel eradication quietly before hardening. 5, machine sensation is not able to work, to the equipment foundation, should stop 24 - after the second grouting 36 h, so as not to damage the outstanding hard layer grouting.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378