Professional manufacturer of tile grout and adhesives with 20 years experience.

Common problems of beauty joint construction-beauty joint factory

by:Kastar     2021-04-06

No one can predict what kind of problems will arise during the beautiful seam construction. Even as an experienced master, there may be problems of this kind. Therefore, the editor today sorted out some of the problems encountered in construction, analyzed them, and gave practical solutions. .Skinning occurs after construction. If the sealant used for the primer is too dry or even in a powder state, it will have strong water absorption. If it encounters a thinner seam layer, it will often seriously affect the beauty. The curing effect and cohesiveness of the joint agent cause the construction surface to peel and fall off. Solution: Perform a comprehensive cleaning of the gap before construction. . Cracks occurred after construction ① Because the construction temperature was too low, or even in a frozen state, the product curing process was affected; ② The degree of drying of the caulking agent for the bottoming of the tile gap was too large, and the water absorption was too strong, so that the product was in Insufficient solvents during the curing and shaping process caused cracks on the construction surface. Solution: Carry out the beautiful joint construction in the indoor climate, and clean the gap filler in the tile gap. After the beauty joint construction is completed, after the beauty joint agent is cured, the hardness and abrasion resistance will not be as hard and wear-resistant as the tile itself. Floor heating is mostly used in the north, and there is a big temperature difference in the four seasons. If the beauty joint is very hard, its elasticity will be reduced. This will easily separate from the tile wall, causing shedding and water seepage. Therefore, the cured beauty joint should not be too hard . In addition, the beauty joint agent has moderate shrinkage, and the surface of the beauty joint agent after shrinkage will be about one millimeter lower than the surface of the tile, so that no matter walking on it or hauling things, it will not directly contact the beauty joint agent. The most likely cause of pitting in the beauty joint construction is that the bottom joint is not cleaned evenly during the construction, or the cleaned powder is not cleaned, or the quality of the joint sealant used for the bottoming is too poor. Solution: For the 'pittingThe beauty seam agent has relatively stable physical properties, and a variety of commonly used solvents cannot dissolve it. Thinner can dissolve it to a certain extent, but the process is relatively slow, and a certain external force is needed to assist in wiping in actual operation. Generally speaking, there are generally three types of tile surfaces: smooth surface, frosted surface, and three-dimensional surface. ① For smooth surface tiles, if there is residual beautifying agent, you can use a knife or wallpaper blade to obliquely remove it; ② For frosted and three-dimensional tiles, you can use a wet sponge before and after the construction and jointing. Wipe the brick surfaces on both sides of the tile joints to keep them moist for later cleaning. How long does it take to dry the tiles? After finishing the tile joints, the curing time of the joints usually takes hours, which is accompanied by the construction environment. Different, such as temperature, humidity, and the width and depth of the gap between the tiles, the curing time of the beauty joint agent will vary. To make beautiful seams, look for the beautiful seam agent factory. Safe, reliable and assured.
Beautiful seam construction problem
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...