Since the glued seam pressure belt construction method since the glued seam pressure belt construction method 1. Processing under 10 mm of temperature crack and part of structure crack, construction process to ensure that cracks on both sides at least lap lap width of 5 mm. 2. Clean up before construction seam crack surface dust and debris, under the condition of the surface drying paste adhesive seam pressure zone ( The road band-aid) 。 Paste, a live band in hand, another hand thumb and forefinger adhesive seam pressure zone ( The road band-aid) Hold in paste, fracture trend, at the same time ensure that the pressure on both sides of the seam with surplus crack width. After artificial compaction, uncover segregation paper, can open the traffic. 3. Construction, asphalt road table below temperature should be in more than 15 ℃, the cement concrete pavement road table should be in more than 20 ℃ temperature.