Double fluid grouting pump adopts the advanced screw pressurization technology, combine the domestic current situation of the construction, after years of research and exploration, the advantages of similar products, and the new high pressure with independent intellectual property rights, thick, large flow of GS series double fluid grouting pump, suitable for all kinds of slurry infusion and injection project. Spray anchor bracing can call their own strength and the stability in geotechnical engineering, geotechnical engineering is to improve the stability and solve complex geotechnical engineering stability is one of the most economic and effective method of spray anchor bracmg leave the grouting technology, design and construction of anchoring perfusion slurry demand is higher and higher, all kinds of construction 'specification' for perfusion slurry pressure water cement ratio and cement mortar is made strict rules, general perfusion slurry equipment is difficult to satisfy. For narrow construction site, the use of large equipment is not convenient and cost is high, a light and easy to operate small GS series grouting pump is the best choice. Suitable for highway, railway tunnel, the urban subway, underground caverns waterproof engineering; Cavern excavation working face grouting water plugging layer, rock formations and concrete grouting plugging water tunnel, cracks, broken rock, rock reinforcement reinforcement of evacuation grouting construction and concrete repair and moisturizing system engineering and so on, is the ideal modern construction equipment construction site. Double fluid grouting pump the introduction of foreign advanced equipment and technology design and development, human use features, easy to carry features with lighter materials, with special tough wear-resisting material, lining up past small double fluid grouting pump is light but very high damage rate, maintenance difficulties, indisposition of faults, the company in a quick disassembling, easy to dismantle and design the perfusion water stop, crack filling wall professional model, with a high load, high pressure infusion time body parts deformation light weight, workers can solve, inconvenient carrying heavy machinery is a professional water leak proof, crack filling wall, build the best tool.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378