Epoxy grout manufacturer elementary introduction how to put an end to the surface rough phenomenon
epoxy floor construction is very need to pay attention to details, a little bit careless can affect the perfect degree of floor, rough surface is one of the easy to appear the phenomenon of one.
this reason mainly has the following:
1, the temperature is too high, the construction site make thinner, volatile speed, epoxy floor paint project haven't flow flat already cured.
2, epoxy floor paint has begun to project the curing, continue to construction, because the paint is a two-component epoxy floor paint project, can produce chemical reaction, after adding curing agent and curing.
3, mixture of epoxy floor paint engineering material can directly use a filtered, mix impurities into the inside, DangTu film after drying will be displayed on the project epoxy floor paint film, if already curing, will still be construction is completed, it will lead to coarse;
above did not notice will cause epoxy floor surface roughness, the solution to the epoxy floor paint works appear coarse what?
1, the amount of time calculating material before construction according to construction, and in strict accordance with the ratio of coating). Cannot be used in more worthy, thinner, need to slow the high point of dry.
2, epoxy floor paint in the construction project must be the base level and site before cleaning the clean, epoxy floor paint engineering materials with filter filter before construction.
3, deal with the lower, begin at the bottom will be in accordance with the requirements of the construction, the middle to put an end to rough phenomenon, before the surface must be clean up the middle, confirm no dust before construction, so we can solve the epoxy floor paint engineering rough phenomenon of the class.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.