Prepare technical preparation: epoxy grouting material construction technology for involving the characteristics of the epoxy grouting materials engineering, project department to do the following technical preparation: 1) , the various measuring instruments for measuring unreeling department, including the level, theodolite, steel tape 5 m, 5 m box staff measuring instrument equipment such as self-checking, have been conducted to anyone who has more than verification period of all the related department to check, and after the inspection qualified, the party shall use, to ensure the accuracy of measuring instruments used by project. 2) Should be carefully checked, according to the design blueprints, and on the axis and the line of review, under review accurate can be below the premise of a construction process. 3) And fully familiar with the construction drawings, construction floor area by some obstacles to be understand. 4) , ensure equipment and close contact between the foundation and ensure the high precision installation needs. 5) And concrete base construction should comply with the regulations of design requirements and norms.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378