Equipment foundation grouting support grouting material equipment foundation mat iron free installation is cancelled shim, leveling of adjusting bolt, machine, equipment weight, and all of the prestressed anchor bolt by grouting layer to bear a kind of installation method. Xinshan reinforcing grouting material now this method more and more popular, equipment foundation grouting material in the absence of mat iron age. Equipment installation is usually placed under equipment base mat iron, by adjusting shim thickness, make the equipment installation to reach the required level and level, and can make each part of the foundation of the equipment, when the secondary grouting can be filled, in order to make the entire weight of the equipment by shim is evenly is passed on to the base. No shim installation method is to put the leveling work, looking for positive, elevation adjustment using oblique iron or bolt is mat iron. When is versed in shijiazhuang grouting LiaoChang finish, carries on the secondary grouting anchor bolt tightening. In the second grouting layer curing period, after reaching its strength, the oblique iron or adjust shim down, then its position in the vacant irrigation with high-strength non-shrink grout material, and tighten the anchor bolts, again at the same time review elevation level and the correctness of the center line. I plant production of high-strength non-shrink grout material is a new type of environmentally friendly materials, its artesian well, rapid hardening, early strength, high strength, no shrinkage, micro expansion; Avirulent and harmless, not aging, no pollution on the water quality and the surrounding environment, good tightness, rust etc, with reliable quality in the construction aspect, reduce cost, shorten the construction period and the tower, grouting material advantages such as t, during the construction of equipment foundation no shim is more and more widely used.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378