Floor paint construction up. the floors paint curing slow
is slow curing epoxy resin material at exceptionally low temperature ( 10° C) Slow curing reaction. 5° C is sure to stop the construction. Has a strong link that appearance and viscosity, the lower the temperature, the higher the viscosity will be, then it will be hard. Curing time is too long would amount to a coating with dust, sand and other stolen goods, and even slow down the time limit for a project. Still is in the construction site and solvent will constitute a curing slow, due to the evaporation of the solvent will take away some of the heat and cooling coating.