Floor paint on concrete ground of shallow of construction requirements
(1) leveling &compaction concrete request, strength requirement is not lower than C20;
2 ground roughness general requirements within 2 m head is not more than 2 mm; Such as the gap is bigger, floor coating need to reduce the gap between increasing;
(3) if you need painting at the bottom of the ground, underground water level is higher, the concrete base shall make waterproof processing.
(4) new concrete dry at least more than three weeks, the moisture content is not higher than 8%;
5] can also be used in terrazzo, etc. The coating on the substrate.
caulking agent Canton plant purification engineering co. , LTD. Is a scientific research, development, sales and construction in the integration of high-tech enterprises. Our main products are: epoxy floor engineering, anti-static, anti-corrosion engineering, PVC floor engineering, sports venues, such as hotline: 13826947746