Floor QiChang home construction before the floor paint engineering construction of the five major requirements for grassroots
in either floor, after processing, in epoxy floor paint before construction, must achieve the following five requirements:
1. Floor surface must be solid at the grass-roots level, no degeneration, pulverization, peeling, the phenomenon such as the drum;
2。 Floor at the grass-roots level surface must be clean, no dirt, dust, grease, mold release agents, sundries effects such as floor lacquer coating bonding with white stains;
3。 Floor surface should be smooth at the grass-roots level, horn line, but need not too smooth, lest affect bond, no larger defects, honeycomb, ballast-surface, holes, cracks and joints fill wrong, no obvious scar, summer-planting;
4。 Floor must be dry at the grass-roots level, application of water-borne floor coatings should be under 10% when the moisture content, the application of epoxy floor paint solvent coating requirements such as the moisture content is not more than 8% at the grass-roots level;
5。 Floor at the grass-roots level, alkaline used floor lacquer coating should comply with the requirements. For surface paint, pH value must be smaller than 8.