In fact this is the essence of the two work well special means of quality control, the two work cannot be a problem, a problem is big problem, its importance is well known, so the general thoughts and actions must be given high attention. Work in addition to its own arrangement deployment good measurement review system, the key parts such as bridge, tunnel, etc must be himself, to prevent measure review system through the motions, formal, not found the problem. Experiment work arranged beforehand work plan, supervise the test indexes and raw materials in the process of quality, strengthen the mixing station, and other important equipment and facilities of metrological supervision and inspection, to prevent the possibility of epoxy grout quality accidents occurred from the sources. The current line test personnel technical level needs to be improved, some basic experimental work are also in the deformation of its shape, do bad, which requires the project to strengthen the work of general guidance and supervision, at the same time to organize the training in time, improve the level of its business, to prevent some low edited by epoxy grout in this paper
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378