In construction of epoxy grout pouring temperature

1, in hot climates, epoxy grout into the mould temperature should not exceed 30 ° C. Exposed to direct sunlight should avoid template and a new pouring concrete, epoxy grout into the mold before the template and the temperature of the steel bar and nearby local temperature does not exceed 40 ° C. Appropriate Ann row began pouring in the late afternoon, unfavorable in the morning to avoid increase when the temperature rises to the highest concrete internal temperature rise. 2, when the site average temperature in day and night continuous 3 d below 5 c or lowest temperature below - 3 c, shall be handled according to the winter construction, the concrete into the mould temperature should not be less than 5 c. 3, new pouring epoxy grout into the mould temperature and the adjoining has hardened concrete or rock, steel, templates, temperature difference between the medium shall not be greater than 15 c. Contact with new concrete has hardened concrete, rock and soil medium, the temperature of the steel and template shall not be less than 2 ° C. 4, in small relative humidity, wind speed under the condition of the larger environment, but the quantitative site sprinkler, spray, wind and other measures, or avoid pouring at this time have larger exposed area of the component.

GET IN TOUCH WITH Us
recommended articles
Knowledge APPLICATION NEWS
no data

Contact Us

Whatsapp : +86 13924533378
Wechat : +86 13924533378
Tel : +86 731 89870169
E-mail : sales@kastarsealant.com
Address: No.1, ShunJing Road, Songxia Industrial Park, SongGang Town, Foshan, China

Better Touch Better Business

Contact Sales at Kastar.

Call Us

+86 13924533378

Copyright © 2025 Kastar adhesive Co.,Ltd. | Sitemap
Customer service
detect