High strength grouting material high-strength non-shrink grout high-strength non-shrink grout material factory 1, & # 8195; Standard cushion method; Shim arrangement on either side of each anchor bolt, this is the basic way to put a mat iron, equipment installation engineering are usually use this shim arrangement. 2, the & # 8195; Tic-tac-toe cushion method; Equipment with a square base and the base area and large bearing grouting material in this way, please contact 15838304411. 。 3, & # 8195; Cross cushion method; The mat method is generally used in small devices, its smaller equipment base, anchor bolt spacing is low. 4, & # 8195; Unilateral mat method; Equipment base is a rectangle, small size and bottom concave again when using this method. 5, & # 8195; Triangle mat method; Equipment has a large, CGM high-strength non-shrinkage grouting material in concave rectangular base on this method. 6, the & # 8195; Auxiliary mat method; This is in the mat method is used, if the spacing between two group of mat iron more than 70 ~ 100 mm or 300 ~ 700 mm ( For large equipment) Should be increased in the basic shim between, a set of mat iron group, known as the auxiliary method. 7, & # 8195; Mixed mat method; It is under the same equipment base, adopt the method of the above two or more backing. In a word, if there is no equipment shim arrangement, should be at the site of the concentrated load, both sides of the anchor bolt and base the place such as corner and stud arrangement mat iron group, which is installed in shim layout principles.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378