Professional manufacturer of adhesives with 20 years experience.

Neoprene latex waterproof epoxy grout how different parts of the construction?

by:Kastar     2020-12-21
Panel with chloroprene latex cement grout epoxy membrane: 1, clear: at the grass-roots level will loose concrete cushion layer, such as epoxy grout clean, prominent bulge out. 2, brush the cement slurry, mixing ratio of cement: latex = 1:0. 05 ( Weight ratio) , add right amount water to mix a gruel, PuTan on the ground, with a broom and brush it again. 3, waterproof with the epoxy grout: with the mixing ratio of cement, yellow sand, latex, 2-0. 35 ( ( Weight ratio) 。 Mixed epoxy grout fell on the ground, with a bar feet, leveling wood float shunping, iron float pressure again, in epoxy grout draw close before final set pressure, thickness of 20 mm. 4, maintenance: after being ground have a certain strength, surface cover bag or sack often water wet, curing time, which shall be determined according to the temperature conditions for 7 days commonly, slag Portland cement should not be less than 14 days, the period shall not be subjected to hydrostatic pressure. Side walls with chloroprene latex cement grout waterproof layer: epoxy with waterproof epoxy grout have a certain strength, often water, keep wet metope, curing time, which shall be determined according to the temperature conditions for 7 days commonly, slag silicon aluminium salt cement should not be less than 14 days end, namely water clean all stained with paint and instrument.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...