Parking lot floor paint construction process
see more as the ground parking lot epoxy floor plan basically has: mortar type epoxy floor, thin coating epoxy floor paint, self-leveling epoxy floor paint. Mortar type epoxy floor paint technology, usually: basal polishing finishing, epoxy priming coat again, once or twice epoxy mortar, two epoxy putty, two epoxy coating. In the thickness of 0. 8 - 1. Between 5 mm. Thin epoxy floor coating type, technology is usually: basal polishing finishing, epoxy floor coating, the epoxy mortar again again and again epoxy putty, the epoxy coating again.
1. National standard rules: coating in - 5℃( 16h) 23 ℃ and + ( 8h) Cycle to store three times, still adhere to its original function remains the same in order to be qualified.
2. Paint construction function
coating construction function is outstanding, usually is refers to the painted coating is easy to ( Brush, spray, roll) , easy flow flat, not present sag, wrinkling, edge, bleeding, bite, drying medium, polishing, painting, and low level of construction environment requirements.
1) smells. Refers to the coating in the process of using the scent.
2. Brush. To the difficulty of the paint brush.
3. Parking lot floor paint flow property. After the application of wet paint film can flow and eliminate the paint marks, and can get a uniform flat after boring film.
4. Lap. Paint will render paragraphs in the section construction, the overlap between the lap sex namely in it the fusion of coating, can flow flat.
5. Lap. The same kind of coating to the difficulty of the multi-layer coating and function.
6 three-dimensional speckle formability. About three-dimensional speckle finish coating, check whether after the application of boring can form the required volume markings.
3. The film features.
(1) appearance. Visual check after coating is dry, such as film smooth, uniform, pinhole, shrinkage cavity, no flow, no significant brush marks, color and standard color difference is not significant, conform to the requirements, appearance shall be deemed to be qualified.
2. Parking lot floor paint engineering boring moments:
a. Table dry times. And dry conditions in the rule, a wet paint film thickness, appearance from liquid to solid, but the appearance is still under the time needed for the liquid.
b. Parking lot floor paint work time. Under the condition of the rule of boring, from pasted thickness of liquid film to a solid film must be the required time.
Contact Us