Polymer structure of rapid repairing materials polymer structure of rapid repair materials manufacturer of polymer structure of rapid repair materials prices with the accelerating of urbanization construction, people also more and more high to the requirement of living conditions. To meet people in life expect and the need of urbanization, many large and medium cities has entered the development and utilization of underground space. Underground civil air defense and underground traffic, underground shopping malls and underground parking and other new type of space station arises at the historic moment. However, the development and utilization of underground space of the main problems is to prevent the groundwater, surface water and capillary water seepage, this also is the development of underground space of Chen pain. Some of the quality problem of the deep is easy to be overlooked. Polymer structure of rapid repair materials can solve most of the problems. So it can not get effective control. If you want to control the waterproof construction quality must be pay attention to the following aspects. People often think of earthwork excavation and waterproof is a matter of imitation of workers, it is poor also, earthwork of the 'dig and foundation pit drainage effect under the stand or fall will directly affect the waterproof construction quality. Therefore, earthwork excavation and waterproof construction is closely related. Project owner in order to save costs, reduce construction cost, earthwork excavation is generally outside the raft template, or even the template on the outskirts of earthwork is pushing mode at the top of the brick parallel, the excavation is completely wrong. The correct excavation is a raft 1200 mm outside began excavation depth of 300 mm, 500 m wide ditch, drainage outside the retaining wall of build by laying bricks or stones build by laying bricks or stones 600 mm high. And drain water to smoothly into the knot inside the Wells. Which is the basement floor ruler can should be the raft with 1200 mm, the size of the earthwork excavation is raft with 1940 mm. 。 In this way can effectively control not yet part of soil seepage of water. The weather is very important especially in the rainy season. For difficult parts of the processing, with high polymer structure of rapid repair materials for secondary reinforcement effect better!
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378