Prestressed pipe pressure slurry prestressed pipe pressure prestressed pipe pressure slurry paste manufacturer price 1 prestressed reinforcement in concrete before and after wear into the channel, the wear should check before beam prestressed pipe pressure slurry pin plate and channel, the position of the plate should be accurate; Hole should be smooth, without water and other debris. 2 of a steel beam should be full of the prestressed steel beam after the overall wear into the channel, the overall in the east, the front end of the beam should be set to wear or special drawing head beam quilt, straight, should maintain a prestressed and only should drag back and forth, shall not be reversed. 3 the provisions of the humidity of the air within the time limit not of grouting after small four prestressed reinforcement is installed in the pipeline, opening the pipe ends shall be sealed to prevent moisture from entering. Using steam curing of concrete, prestressed pipe pressure slurry in maintenance should not be installed prior to the completion of the prestressed steel. 5 in any case, when near the installation of a prestressed concrete structure or component during welding, the prestressed pipe pressure slurry are dealing with all of the prestressed steel, pipes and ancillary components to protect, prevent splashing slag or other damage. 6 to before concrete light built in east pipe, prestressed concrete after the completion of the installation should conduct a comprehensive inspection, found may be damaged pipeline. Before concrete pouring, the pipeline should be all not to trade on the pore openings or damage repair, and shall check in the process of casting concrete prestressed reinforcement can move freely in the pipe.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378