Seam floor tile beauty after a few days can trample
if you can control the temperature is above 5 degrees, after 3 hours, can leave, only refers to the construction personnel to wipe the dirt from the construction. Normal people trample on it, had better be in 48 hours later, usually after two days can be stepped on.
floor tile of wall of brick should be soaked in water before the shop is stuck, should be the next soaked, air-dried onto surface without watermarks, before the shop is stuck. Water cement the ground should be wet when the shop is stuck, with cement mortar mixed 108 glue, daub on the back of the tile, must sew closely, and timely adjustment, after every spread line inspection. Bathroom, kitchen, balcony, floor, must tilt to a floor drain, slope should be controlled in 2% ( 3mm) Or less.
turn on edge horn line of brick should be paid attention to when the problem: the whole brick width should not be less than 1/3 of the whole brick, brick and the whole application in the shade is not obvious or place, Yang Angle in the whole brick row, on both sides of the window should be with the whole brick. For a bricklayer's acceptance mainly has several parts: the first error within two meters shall not be greater than 2 mm, brick joints shall be neat, uniform size, may not be free drum, shall not be loose, with two meters long ruler or acceptance by foot.
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378