Ceramic tile seam beauty more and more popular, and beautiful seam division of work is becoming more and more careful, the process is becoming more and more refined. Tao guest adjusted simplicity and small make up seam construction process, and eight formula to remember, so that beginners can faster memory and digestion.
1.
the so-called open, namely slit! Ceramic tile, clean the seam an agent on the pavement crack, the first step, slotted, slotted nothing, that is not the original crack size larger or smaller, and should be the original gap filling of cleaning out, let gap & other Fully open & throughout; 。 Usually we use the tool of slotted knife, knife and slotted cone, etc. , slotted depth should ensure that more than 3 mm. Slit width should be in the original shop is stuck the maximum allowable size of aperture as a benchmark, and ensure that it does not hurt ceramic tile.
2, jie
gap opens, depth and width has been achieved, but the gap of clean degree is not up to standard, so as to ensure the seam an agent in the late of ceramic tile ware stick relay and long-lasting function, must be clean, clean object for the ash, oil, stains, water. Should use high power vacuum cleaner dust cleaning, will make a comprehensive cleaning, surface and aperture are wet cloth clean grease application, avoid MingShui as far as possible. Water should or mop dry with a cloth, and then placed until dry crack.
3, fill the
to fill a beauty is filled seam an agent, we use the word to fill in, without having to play, is a special emphasis on the seam an agent filling quantity and the seam an agent of sealant evenly. Generally fill glue depth to ensure that reach 3 mm, thus ensuring with glue amount, late adhesive seal strength and service life have very good protection.
4, press the
pressure after the glue, plastic operation, we should promptly pressure generally should be done in 10 minutes, especially the summer high temperature, glue curing fast, should be timely for seam pressure operation, to ensure that the pressure adhesive colloid surface gloss and smooth degree.
5, clear
gel after curing, the remaining material on both sides of the gap we should timely cleaning, cleaned up the remaining material, in order to screening process if there is a legacy of sealant for defects.
6,
cleaned up the remaining material after each gap should be to do a check, make sure each aperture has cure, there is no place is not in conformity with the acceptance standard of construction. For not completely cure, edge horn glue has flaws, problems of rough parts, the next step of construction steps should be taken as soon as possible.
7, fill the
in the gap in the process of the details, should be given the most timely leak fill a vacancy, ensure each gap acceptance. Sweep 8,
when make sure each aperture can reach the acceptance standard, after cleaning cleaning, the final response to the construction environment to ensure the construction environment clean and tidy.
the above as the basic construction specification for reference, but because of the construction process, have certain differences in the tools we use, construction conditions have some differences, therefore, for special construction conditions, we should also have a special treatment.
recommended articles:
floor tile seam construction steps method.
the seam tutorial, very detailed the seam construction step tutorial
when to use the seam an agent how construction good
us teach you ceramic tile seam a easy way to save money at home do