And speaking of the seam, there is a special strange points, the seam of the construction project is not decorate a company to contain, we need to contact their beautiful seam teacher, decorate a company to stitched the master does not have its own beauty. Although want to bother to some more, but, generally master the seam is spread by word of mouth. As a result, we find the beauty of the seam through acquaintances teacher, or do you usually do well.
the seam one day can do how much
the problem is difficult, if it is 800 * 800 standard gap this great construction 20 or so a day, a 3 ~ 5 mm or so can the construction of 75 ~ 80 meters 1500 meters to 1600 meters, that is to say, can construction, of course, this is the most ideal state.
because you may want to buckle seam, because you may want to stick with paper or waxing, construction way, of course, there are other problems so actual construction general 10 ~ 15 day is very good, only if it is subjected to a spelling a flower, Mosaic one day you can do a 10 square is very good.
the seam when do?
satisfies the requirement of the construction joints have two: one to dry, without dust. The seam construction time, therefore, suggest to choose one of the following four stages:
1. Tile after a week,
2. In front of the big dust decorate project;
3. In front of the cabinet installation;
4. After good to brush paint or wallpaper, move furniture before.