Problem a week or so has 1400 square meters of concrete ground surface peeling, because it is near winter under the situation of the construction, and two or three days after the concrete ground after a rain, under the above for the thin layer cracking on-site sales personnel to the scene photos, sales personnel according to the picture situation to manager li recommended luqiao fast repairing material type plaster to repair construction, because epoxy grout has ultra-thin patch, with concrete has good bonding strength, the thinnest can accomplish the 3 mm and not broken, do not fall off, do not crack characteristics, very suitable for repair from the construction site manager li. Above material for repairing material approach manager li decided to agree on this plan for repair, but need to send technical personnel to guide the construction company. After receipt of the material after remittance company logistics department organization delivery, after-sales department ready to travel to the destination, cooperate with construction unit manager li on-site construction guidance. Under the coordination and cooperation of both sides, can get this done in two days, 1400 square meters of thin layer construction projects. After sales staff communicate with manager li on telephone pays a return visit, he said, heart finally put down, because only a week or so engineering acceptance, party a own more than 100 balance payment can give knot at the end of this year. The real case
Contact Us
Better Touch Better Business
Contact Sales at Kastar.
Call Us
+86 13924533378