Home floor QiChang theory of different epoxy floor coating thickness difference
epoxy floor paint is a kind of the ground material with high strength, wear resistance, beautiful, have no juncture, quality of a material is solid, drug resistance, anti-corrosive, dustproof, easy maintenance, low maintenance cost, etc. Can design according to the requirements of the different USES a variety of solutions, the thickness difference of epoxy floor materials to analysis and some construction methods:
' The thickness of epoxy floor difference 】
1, epoxy floor coating: the most common a kind of epoxy floor materials, also called a thin layer of epoxy floor paint. Because of its characteristics is thin, so the coating is thinner. Bottom coating under the general construction are under 1 mm, thickness of engineering in recent years, many in 0. 2 - 0. Between 5 mm. The thickness of the layer is about 0. 1 mm, very thin. Also someone with spray technology for construction, more thickness can be reduced.
2, epoxy mortar floor: the thickness of coating is relatively high. Coating used in 1 - mortar coating The construction of the 3 mm, surface construction technology, the floor material, thickness in a 0. About 1 mm. The total coating thickness in a 1 - 10 mm between.
3, epoxy self-leveling floor material: also called flow exhibition floor, epoxy self-leveling mortar floors, because it was because of self-leveling, so the thickness of the higher of the two. Blade coating in the 1 - putty layer 3 mm is a common situation. The surface in the case of self-leveling remain at 0. 7 - Between 1 mm thick a lot than before. Coating thickness keep in 1. 5 - About 10 mm.
4, epoxy anti-static floor: its construction when adding a conductive path this layer. Any other way construction basic and common ground. The total thickness in general is 0. 2 - 0. 5 mm, it is suggested that not more than 1 mm.
【 Epoxy floor materials construction method 】
a, epoxy floor paint on the surface of the handle
1, the newly completed industrial floor must pass a certain maintenance rear can construction, about 28 days.
2, remove floating on the surface of the cement slurry and the old paint and adhesive waste sundry.
3, thoroughly clean the surface of the oil pollution.
4, clear water, and make the tide dry thoroughly.
5, dust-free clean need cleaning on the surface of the machine and large vacuum cleaner.
6, flat surface to allow space for 2 ~ 2. 5 mm, water content below 6%, PH 6 ~ 80.
7, matting on the surface of the floor, need a dust-free polishing machine to complete, and vacuum cleaner thoroughly clean.
8, there are holes on the surface of floor and applies a putty to fill the batch of scraping, after work, grind the vacuuming.
2, batch blow two putty
1, in the work ( 25 ℃, about 4 hours) Future primer appearance to choose two batch of blow be bored with child, to ensure that the floor of the wear resistance, pressure resistance, knock against, the function such as water, mineral oil, acid and alkali solution, and adjust the flatness on the ground.
2, the intention of using 100 ~ 200 quartz sand and epoxy group of scraper, as 1 putty, want abundant mixing evenly, leveling, it first used to strengthen the function of abrasion resistance and compressive strength of the earth.
3, with a sandbag dustless roll grinding machine polishing putty, 1 and dust cleaning.
4, with 200 & ndash; 270 intention of quartz sand and epoxy group of scraper, as putty, 1 to abundant mixing evenly, leveling, it first used to enhance the wear resistant and flatness of the earth.
5, with a sandbag dustless roll grinding machine polishing putty, 2 and dust cleaning.
6, the two work in the future, putty should be repaired if there is any pits, cracks, and then with a flat sanding machine burnish, make it smooth, and dust cleaning.
7, quartz sand using mesh decided by field engineers according to the specific conditions.